Changzhou Chenye Warp Knitting Machinery Co., Ltd.

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsShade Net Knitting Machine

Sun Shade Net Knitting Machine Stable Performance For Outdoor Swimming Poor

Sun Shade Net Knitting Machine Stable Performance For Outdoor Swimming Poor

    • Sun Shade Net Knitting Machine Stable Performance For Outdoor Swimming Poor
    • Sun Shade Net Knitting Machine Stable Performance For Outdoor Swimming Poor
  • Sun Shade Net Knitting Machine Stable Performance For Outdoor Swimming Poor

    Product Details:

    Place of Origin: China , Jiangsu
    Brand Name: Chenye
    Certification: ISO ,CE, TUV
    Model Number: SROA

    Payment & Shipping Terms:

    Minimum Order Quantity: 1 set
    Price: Negotiation
    Packaging Details: 40HQ/Set
    Delivery Time: 60 days after deposit payment
    Payment Terms: L/C, T/T,Western Union, MoneyGram
    Supply Ability: 20 sets per month
    Contact Now
    Detailed Product Description
    Condition: New Product Type: Shade Net Making Machine
    Type: Single Needle Bar Knitting Style: Knitting
    Computerized: Yes Power(W): 3~7.5KW
    Color: Bule/Green/White/Customized Size: 2m/2.5m/3.4m/3.8m/4.5m/5.5m/6m/6.6m/8.6m/9.6m/11m
    High Light:

    shade net manufacturing machine

    ,

    shade net making machine shade net machine

    Swimming shading net making machine raschel knitting machine china

     

     

     

    PRODUCT DESCRIPTION

     

    Knitting machine is suitable to manufacturing raschel bag by using PP,PE,HDPE as raw materials. It's an ideal choice of weaving machine for knitting industry. If you don't want produce raschel bag and you can produce shade net by this machine ,the machine can produce double layer shade net.

     

    Application:This machine is used to produce Agriculture sun shine shade net, sports net ,purse net and deep sea aquaculture net and so on.

     

    Feature:The machine is equipped with oiled eccentric gearing and the negative yarn let-off system.

    Needle Type:Block latch needle ,individual latch needle or Compound needle

    Gauge : E3,E6,E7,E8,E9,E12,E14,E16,E18

    Number of bar : 2~8

    Working Width : 135", 150", 170", 220", 240". 260"

    Take-up manner: 2 rollers with friction drive, center shaft drive, 2 rollers with friction drive, separately-standing, center shaft drive, separately-standing

    Relevant corollary equipment: Warping Machine

     

    Type Size(L×W×H) Weight(Kg) Power(KW) Speed(rpm)
    Main motor Inching motor
    SROA-135 4300×1700×2300 4700 3 0.37 200-480
    SROA-150 4900×1700×2300 5000 3 0.37 200-480
    SROA-180 6100×1700×2300 7500 5.5 0.75 200-420
    SROA-220 7300×1700×2300 9000 5.5 1.5 200-420
    SROA-240 8200×1700×2300 10500 5.5 1.5 200-380
    SROA-260 10300×1700×2300 12000 7.5 1.5 200-380

     

    DUTIES AND RESPONSIBILITIES
    1. Prepare, obtain approval, issue and implement company quality control (assurance) program manual in compliance with owner
    contract and company requirements.

    2. Be responsible for the interaction with owner, agencies, subcontractors and internal departments on quality related matters
    including performance activities such as audits, program setup, program planning etc.

    3. Overseeing and coordinating daily prioritization of QC testing, including scheduling of staff and equipment productivity
    assessments.

    4. Manage and direct activities and resources of the quality control department to meet company objective of producing highest
    quality product within established budget.

    5. Ensure product is manufactured in accordance with contract specifications and codes as set forth by the Corporate Policy.

    6. Maintain materials equipment and instruments related to manufacturing and testing of product in conformance with all
    regulatory codes and specifications.

    7. Continuous improvement to maximize product quality and minimize costs.

    8. Participating on teams as the Quality Control liaison as required

    9. Direct supervision of staff.

    10. Provide feedback and evaluations as needed and required.

    11. Approving or rejecting raw materials, in process and finished goods according to company and customer specifications

    12. Troubleshoot instrumentation issues.

    13. Train employees as required. Monitor training plan and matrix as required ensuring ongoing compliance and staff proficiency.

    14. Assist with management of critical programs such as stability program, reduced testing program, Environmental Services,
    retained samples, etc.

    15. Maintain and improve level of quality by managing and implementing inspection criteria and procedures of quality control
    inspections in the manufacturing plants and job sites consistent with all applicable standards and specifications.

    16. Approve or reject product manufactured.

    17. Develop and review annually manufacturing and quality control standards to maintain CSA certification.

    18. Authorize and issue Certificate of Compliance for product manufactured.

    19. Prepare annual budget and ensure costs are controlled accordingly.

    20. Take active role in investigating and resolving problems related to quality, including sourcing substitute materials
    and/or suppliers.

    21. Implement corrective actions based on statistical information gathered.

    22. Analyze statistical data to determine trends and implement corrective action as required.

    23. Responsible for calibration of instruments and certification of testing equipment, gauges, scales.

    24. Source and employ accredited firms to conduct annual inspections and certification.

    25. Communicate and co‐ordinate objectives with manufacturing personnel and departments to improve the manufacturing
    process to be more cost effective by maintaining continuous high‐standards of quality and minimize rejection of product.

    26. Ensure product is manufactured in accordance with established practices, procedures, to meet customer/contractual obligations
    and in compliance with regulatory codes and standards.

    27. Staff selection/development ‐‐ ensure staff has appropriate qualifications, knowledge to meet objectives.

    28. Performs other duties as required.

    Contact Details
    Changzhou Chenye Warp Knitting Machinery Co., Ltd. Leave Messages
    Send your inquiry directly to us (0 / 3000)