Changzhou Chenye Warp Knitting Machinery Co., Ltd.
Place of Origin: | China , Jiangsu |
Brand Name: | Chenye |
Certification: | ISO ,CE, TUV |
Model Number: | DRCA |
Minimum Order Quantity: | 1 set |
---|---|
Price: | Negotiation |
Packaging Details: | 40HQ/Set |
Delivery Time: | 60 days after deposit payment |
Payment Terms: | L/C, T/T, D/A |
Supply Ability: | 20 sets per month |
Type: | Double Needle Bar | Condition: | New |
---|---|---|---|
Product Type: | Artificial Grass Making Machine | Knitting Style: | Knitting |
Computerized: | Yes | Power(W): | 3~7.5KW |
Color: | Blue/Green/White/Customized | Size: | 2m/2.5m/3.4m/3.8m/4.5m/Customized |
High Light: | raschel warp knitting machine,raschel knitting machine |
New Machinery Sports Artificial turf lawn grass Raschel weaving machine
PRODUCT DESCRIPTION
Application:This machine is used to produce sport Artificial turf lawn,shading net, Artificial grass and so on.
Feature:The machine is equipped with Oiled eccentric gearing and 3-rollers positive feed yarn system.
Needle Type:Block latch needle ,individual latch needle or Compound needle
Gauge : E1,E2,E3,E4,E6
Number of bar : 2~9
Working Width : 170", 210", 240". 260"
Take-up manner: Separately-standing take-up
Relevant corollary equipment: Extruder Machine
Type | Size(L×W×H) | Weight(Kg) | Power(KW) | Speed(rpm) | |
Main motor | Inching motor | ||||
DRCA-170 | 6000×2200×2700 | 9000 | 5.5 | 0.75 | 600-800 |
DRCA-210 | 6800×2200×2700 | 10000 | 5.5 | 0.75 | 600-800 |
DRCA-240 | 7500×2400×2800 | 11000 | 5.5 | 0.75 | 600-800 |
DRCA-260 | 8200×2400×2800 | 12000 | 5.5 | 1.5 | 600-800 |
QUALITY CONTROL
The Quality Control Lead shall be responsible for the supervision and coordination of activities for workersengaged in inspecting
incoming materials, components, and finished products to ensure in inspecting incoming materials, components, and finished
products are meeting the requirements quality standards and customerspecifications.
Job duties will include the weld mapping, preparing inspection procedures Inspection and Test Plan,supporting procedures for each
system.
The Quality Control Lead shall inspect during piping fabrication andprepare quality documents phase with fabrication/construction.
Other responsibilities will include the notification of suppliers and subcontractors of reasons for rejection of materials and parts
received, and maintaining an open dialogue with customer representatives to resolve complaints.
The Quality Control Lead will be responsible for the coordination and effective scheduling of workers to meet targets and quality
standards.
Responsibilities will include the training of staff in production methods, safety, policies and procedure, as well as the identification
and correction of potential work problems and health and safety issues.
In the course of their duties, the QC Lead will prepare a range of reports, and hold responsibilities for the effective budgeting for
their area.